Scheduled Power Infrastructure Maintenance - CA-EAST-01A
CoreWeave · 最近儲存的提供方狀態:scheduled
官方來源文字以原始語言顯示。
最近儲存的事件狀態不是當前服務狀態。來源列表可能不完整,事件從來源消失不確認恢復。請開啟當前報告或官方來源檢視較新證據。
已儲存事件詳情
- 提供方狀態
- scheduled
- 提供方影響程度
- Provider status 200
- 提供方記錄建立時間
- 25 Sep 2026, 09:05:26 UTC
- 提供方記錄更新時間
- 25 Sep 2026, 09:05:00 UTC
- 計劃視窗
- 13 Oct 2026, 11:30:00 UTC → 16 Oct 2026, 18:00:00 UTC
提供方報告的受影響元件
- CoreWeave Infrastructure
675c550a4449ab5853e76e20
這些關聯描述此事件的報告範圍。不能確認當前元件可用性或已核實依賴關係。
記錄建立時間未必是故障開始時間。未報告的時間保持不可用。我們不根據收集時間計算故障時長。
CoreWeave 公佈的平臺和地點元件、事件及當前或未來維護。提供方地點名稱不能確認 GlobalStatus 的地區探測覆蓋或客戶部署的健康狀態。
已儲存修訂中的提供方更新
最新優先。最多顯示最近 20 份已儲存內容修訂中的 100 條不同更新。同一提供方時間的文字修訂單獨保留。
- Provider state 100
Reported components: CoreWeave Infrastructure. Reported locations: CA-EAST-01. CoreWeave is planning power infrastructure maintenance at CA-EAST-01A to install permanent power-quality meters and branch-circuit monitoring equipment. The overall planned schedule runs from 13 October 2026 at 11:30 UTC to 16 October 2026 at 01:00 UTC. Work will occur in separate maintenance windows within this period. Location: CA-EAST-01A. Scope: The work covers 24 power distribution systems. Each system will be isolated for installation work, then restored and validated before work starts on the next system. Impact: Affected equipment will temporarily lose one power source and operate on its remaining redundant sources. No customer outage is expected. Power redundancy will be reduced during each individual maintenance window, and an additional power failure could cause service disruption. The associated generator and cooling equipment will also be temporarily unavailable. CoreWeave will monitor the infrastructure throughout the work. For questions or assistance, please contact support@coreweave.com. This activity is classified as Planned Maintenance under the CoreWeave Terms of Service Maintenance Policy (https://docs.coreweave.com/docs/policies/terms-of-service/maintenance-policy).
在 06 Oct 2026, 13:59:11 UTC 的已儲存修訂中觀察到